Showing posts with label Quarter 2. Show all posts
Showing posts with label Quarter 2. Show all posts

Tuesday, 8 April 2014

FAL 2014 - Qtr 2 Goals List

Finish Along 2014


Time to stake my claim on WIPs or UFOs that I'm aiming to tackle during Quarter 2.  So, here goes:



1 - Crazy Scrappy block quilt
16 of these cheery blocks and some navy fabric for sashing are tucked up in a box on the sewing room shelf. I think it's time to make something of them.





2 - Mystery Medallion Quilt
Not quite such a Mystery now that the quilt top is finished, my medallion quilt is currently hanging on the back of the sewing room door.  If I can source one of those dual positioning quilting guide arms I would like perhaps to spiral quilt this one.  I would love to finish it this quarter. 


3 - Ruby Churn Dash bed quilt
I think I have made about 33 of the 49 churn dashes that I need for this bed quilt, and I love them!  The remaining blocks are all cut and it would be good if I could finish this during the quarter so it can be in use when it becomes warm enough to sideline the duvet (she says optimistically).



4 - Kaffe Fassett Sparkling Gemstones Quilt
Left aside with a Pam Lintott Sparkling Gemstones quilt pattern in mind, this sadly neglected fabric deserves a little attention.  I think I could be pushing things hoping for a finish on this one in quarter 2, but sure you never know ....




5 - Crocheted Ripple Throw
Been quite a long time since I started this crocheted throw back when I was in need of amusement during the many long hours a week I spent as a poolside mum.  Things changed and I haven't been poolside this year so the bag of crochet has been a little neglected.  It needs to be finished and since I only have that small amount of yarn remaining, I am hoping that Qtr 2 will see it rippled to a pretty finish. It won't be huge, probably just a lap sized throw.



6 - Hunter's Star Cushion
I really need to switch out some older cushion covers from the lounge and I decided a while back to use the Hunter's star pattern for one of the replacements.  The fabrics are pulled and I've already cut some of the paper templates, so maybe one weekend I can turn on some tunes and make this a Qtr 2 success.

Well, 4 quilts, a throw and a cushion feels like a tall enough order to be getting on with.  If I had time I'd love to make up a few more lounge cushions too, but since I haven't started or got a plan for them they're not for this quarter's list.  Maybe I'll get a chance to sneak them in among the FAL items or at least start them so they can be quarter 3 projects ;-)

Linking up with Katy at The Littlest Thistle.

Related Posts Plugin for WordPress, Blogger...